|
|
I am currently working on the following projects:
Some of my previous projects were the following:
- “Design of spare-parts inventory for BEKSA”, Fall 2004 (Supervision)
- “Material flow planning at BRISA”, Fall 2003 (Supervision)
- “An inventory planning model for BEKSA”, Fall 2002 (Supervision)
- Contributed to design and development of an optimization-based pricing software for U.S. headquarters of a major European electronics firm. (Fall 2001)
- Designed and developed a prototype simulation software for (rail transportation) fleet planning. (1999-2000)
- Designed and developed a decision support tool for a major U.S. petro-chemicals company. (1999-2000)
- Developed a proposal suggesting a major change in the distribution system of large appliances manufacturing firm; Created a dynamic spreadsheet-based cost model with complete documentation for the feasibility analysis in the proposal. (1994)
|
|